Home construction or building a house requires a good planning and proper resources. Whenever the phrase ‘house building’ comes first, the first and the most common question arises, “How many man hours does it take to build a house?”. Though the inquiry is very simple but takes many essential factors.
How many man hours are needed to build a simple home depends on a couple of factors- the dimensions of the structure, the complexity of the design, the materials and resources used, and the skill of the builders etc.
In this comprehensive article, we will discuss the different aspects that impact the building of a home, including the required timetable, the required labor, the avoidance of construction delays, and many more. Without further delay, let’s jump into the main article.
How Long does It Take to Build a House?
In the ideal set of scenarios, the construction of a house may take as little as three months or as long as six months. It is dependent on quite a number of crucial features, including:
- Location Point.
- Permission and Regulation.
- Labor Type.
- Supply of Materials.
- Proper Timeline & Guideline.
- Weather and Environment Condition.
- Individual Choice Factors.
- Design Complexity.
On an average, it is almost 6-7 months required to build a single family private occupied house in America, a report from the United States Census Bureau in 2021. But varies on house type. If we talk about proprietor made house, it takes almost 14.3 months. It drops when the house is to build for sale purpose. Around 6.7 months need to build sale purposes homes.
Steps to Build New Home & Timeline
Building home or house construction project is made of several steps and factors. There is a proper steps and timeline involves building a home. Here below we will go through it:
Site Preparation (Week 01)
In every house building project, the first and foremost step is to visit or prepare the site. In this phase it takes couple of factors:
- Area Clearing Process.
- Ground Levelling.
- Checking and Installing the utilities mainly waters, cable lines and power pipelines.
Foundation Base (Week 02)
If we want to make a strong and compact house, we need a good level of base. Factors that should be addressed here:
- Condition of the soil.
- Dimensions of the building footprints.
- House Type.
- Environment Condition.
- Location.
Plumbing (Day 14)
Whenever we will work with plumbing, an expert and licensed owned plumber is needed at any cost as it is one of the key stages in building a house. Properly and accurately plumbing is necessary.
Slab Poured (Week 3)
A slab poured is a kind of solid substructure that is typically four to six inches thick and cast in one piece. It’s used as a base for buildings and as their flooring at the same time. It is often used in climates with low average wintertime temperatures, when soil frost levels are shallow.
Framing Wall Sections (Week 4)
A house’s frame is often built from timber. Beams and trusses are its typical building materials.
Rough Exterior (Week 5)
In this segment we will work upon:
- Structural level points and integrity.
- Windows.
- Doors.
Interior Layout (Week 5)
It can not be done until any preliminary exterior works. As the location of the windows and entrances must be coordinated with the interior layout.
Roofing (Week 5)
After completing the interior layout, the next step is to the roofing. Roofing is the basic construction framework.
- Shields the house from bad weather condition.
- Protects house .
- Insulates the house framework.
HVAC (Week 6-9)
HVAC system must be installed by a licensed expertise or skilled technician to guarantee proper functioning and efficiency because of avoid any damages.
Electrical (Week 6-9)
Electrical system and function implementation is an important factor during building a house. It has parts:
- Electrical Wirings.
- Electrical Dashboard.
- Circuit Board.
- Socket port implementing etc.
Qualified and licensed owned electrical technician is necessary in electrical system implementation.
Insulation (Week 10)
To keep the house warmer and cozier in cold days and to make cool in hot days, proper insulation system is necessary.
As like other steps, expert labors are necessary to ensure the quality level.
Exterior Finishes (Week 12-14)
After completing the insulation stage, we will go work with it. Factors to make it in under mind is:
- Roofing.
- Trim.
- Siding.
Interior Finishes (Week 14-18)
In this stage, we will work on:
- Walls and Flooring.
- Cabinets or Rooms.
- Appliance Fitting.
Landscaping (Week 18-24)
In this landscaping segment:
- Planting trees and flowers included.
- Yards.
- Walkways.
- Swimming Pool.
- Garden.
- BBQ stand.
How to Avoid Construction Delays?
Couple of factors influencing on house building delays. We will talk about these in this segment:
1. Proper and a Detailed Strategy
Proper and detailed strategies will cutoff extra time and efforts. Detailed plans, cost and budget documents, experts hiring, and most importantly obtaining the necessary permission letters to ensure a hassle-free process.
2. Hiring Qualified Contractor and Experts
Qualified and licensed owned experts, contractors will end up any projects within timeframe and budget boundary. They are consistent and know the right job to do in right time with the right people.
3. Be Adaptable
Anything can be happen project budget or schedule can be changed any time due to design or any other factors. Be flexible on it.
4. Maintaining a Proper communication
Properly maintaining communication with contractors and labors can ease the efforts and can help to build a house within a timeline.
5. Smooth Supply Chain
Smooth supply chain can avoid delays. Necessary raw materials, equipment and tools and right manpower can help to finish house building within any timeline.
6. Weather Condition
Another crucial factor is the weather condition. Sometimes, hot summer or typical rainy days made delay the working progress. So, it is one of the factors that cannot be avoided delays easily.
Read Also: How Much Does It Cost to Raise a Garage Roof
Main Factors that can Affect Build a House
The main factors that can affect during building a house are:
- Soil Type.
- Site topography.
- Labor Type – Skilled Labor can make your project finished within timeframe.
- Smooth and Consistent Supply of materials and resources.
- Project Location.
- House Size.
- Proper Documentation.
- Labor Availability.
FAQs
How fast can you build a house?
There is no specific answer for this question. Number of factors are involved. Such as size of the house, skilled labors, smooth supply chains, proper timeline and guideline, weather condition etc.
Can you build a house in 3 months?
To make a good and solid house, we cannot make it ourselves. A minimum of 7-8 months is required to build a simple, family-owned house or a sale-purpose home. So, within this timeline, we cannot build a solid house.
How long would it take 1 person to build a house?
It can vary across a number of factors. If the person is skilled in his labor and planning system, then it will take one timeframe, and if not, then it will take another timeframe. But it would take an average of 12–14 months to build a well-designed house of good quality.
Wrap Up
House building is not a simple task at all. It takes time, efforts and various other factors. We have already go through different factors that influence on how many man hours requires to build a house.
Home builders, aspiring homeowners and curious people can learn a lot exploring the article. They will now embark on construction timeline, plan, cost and execute home building project more effectively and overcome any challenges during work.